Subcontractor management checklist for small contractors

Subcontractor management checklist for small contractors

Subcontractor management works when scope is written, payments are clear, you do a short weekly check, and the work is documented on the job — not in a WhatsApp group that mixes three sites. This checklist covers before you hire, during the job, and close-out.

A good subcontractor saves time. A subcontractor with no written scope costs more than their price: delays, a bigger bill, and a fight at the end. Contractor management software does not need to be complex. The same sequence on every job is enough.

Before you hire

  • Name, phone, and exactly what they do — on the project, not only in your phone contacts
  • Two past jobs you can ask about, or photos of similar finished work
  • Who brings materials and who pays for them
  • A possible start date, and how many days they estimate
  • Who covers if they do not show on the day you booked

Without those five lines, you start on hope. Hope does not hold a schedule.

Scope and payments — write them before they arrive on site

One sentence on what is included. One sentence on what is out. A price, or a unit price. How much upfront, how much after a stage, and how much at the end. Without that, every “just add this” becomes a new bill.

Send it in a message or email and ask for a written “approved”. Keep the approval on the project. If there is an extra mid-job — write the price and approval before you start, not after.

A short weekly check-in

  • What finished this week, against what was agreed
  • What is stuck, and who must answer (you, the client, or a supplier)
  • When they come again, with a clear time
  • One or two photos of the site state

Ten minutes on Friday saves a Sunday emergency call. If they miss twice with no message — replace them before the next stage depends on them.

Document the work on the project

A short log: who was there, what was done, what is missing. Photos on the same job. Check the bill against the quote before you transfer — check before you pay. When it all sits on the project, you are not hunting an old message across groups.

Closing out

  • A short defect list with a photo and a place
  • A fix date, not “soon”
  • A final bill against what was already paid
  • A short note: will you work with them again, and why

A clean close saves the same talk on the next job. If you run several sites, keep a separate project per site — see the main contractor page. Basic: first month free, then $25/month for one open project.