An HVAC maintenance visit log is the site, the unit, what you did, what you found, and the next date — written before you leave. WhatsApp is not a contract history. Helmate is an app: each maintenance contract can be a project with that visit history on the phone. Basic: first month free, then $25/month for one open project.
Spring tune-ups without a log all sound the same in May and all sound different in August when the compressor dies. The customer says you 'just changed a filter'. You remember a bad capacitor you mentioned in the driveway. There is no line on any page. HVAC maintenance visits only protect you if they are written per site, per unit, same day.
US/CA: maintenance agreement, filter plan, spring/fall visit. UK heating engineer: annual boiler service, landlord certificate where it applies. AU: air-con maintenance before summer. The form changes. The log does not: unit identity, work done, defects found, customer told, next visit dated.
A short template that fits a 45-minute stop
- Site and unit: location, make, model, serial if you can see it
- Filters: size, replaced or not, who supplies them next time
- Coils, drain, electrical visual, and any reading you actually took
- Defects found, in plain words, and whether the customer approved a repair
- Next visit date, on the project, not 'see you in six months'
If you found a failing capacitor and they said no, write 'customer declined capacitor, estimated date given verbally' — then send the number in a message if you want to get paid later. Declined work that is not written becomes 'you never told me' in July.
Do not mix maintenance with the last changeout
A maintenance contract is its own project. Dumping twelve visits into the 2024 changeout file hides the history. The changeout has serials and start-up; the visits have filters and defects. When you sell a new unit, you still want the visit log that showed the old coil rotting for two years. Keep both. Link them in a note if you want. Do not merge them.
Scheduling those visits without eating an install day is the other half: HVAC scheduling. A 'quick filter run' that becomes a coil clean in a 40°C roof is a schedule event, not a surprise you only tell the office at 18:00.
Photos on maintenance are for the next argument
Dirty filter you replaced. Drain you cleared. Rust on the cabinet you already flagged. One photo each is enough. The camera roll is not the log. The project is. Same rule as install notes: job notes for changeouts.
Money on a maintenance contract
The visit fee, the filters, the declined repairs, the repair they approved on the driveway. Receipts for parts you used on the visit go on this project: receipts per job. If the agreement was sold as 'parts extra', the quote for the extra must exist before you fit the part — quote vs estimate.
Helmate does not auto-invoice the visit. It holds the log the invoice should match. Field-service tools that invoice from a job card are a different product. We do not pretend otherwise.
Landlords, boilers, and summer splits
UK heating engineers on rental stock already know the annual service is a legal rhythm, not a nice extra. The log still has to say which appliance, what you found, and whether anything was unsafe. A certificate in a drawer without the visit notes is a thin defence when the tenant says nobody came. Put the certificate photo on the project next to the visit. Helmate does not issue the certificate. It keeps the file with the date.
Australian summer splits fail in November because the drain was already slow in August and nobody wrote it down. A one-line visit log ('filters ok') is how that happens. Write the drain. Write the coil. Write 'customer shown algae in the tray'. Then the November no-cool is a documented skip, not a mystery.
US filter plans die when the size is only in someone's head. Write 20x25x1 on the project. The helper who never visited that basement can still load the van. That one line is worth more than a branded 'maintenance module' Helmate does not have.
When a maintenance visit becomes a changeout
You find a cracked heat exchanger or a coil that will not clean. Stop. Write the finding. Send a changeout number. Do not 'start taking it apart because we are here' without a written OK. The maintenance project keeps the finding. A new project holds the changeout if you sold it. That split is how you still have a maintenance history after the new unit is in.
Free vs paid — Basic: first month free, then $25/month
Helmate is an app. Basic: first month free, then $25/month for one open project (planning or active). Finished jobs do not count. Calendar and tasks on that project are included. Hands-free talk, receipt scan, work email, and WhatsApp from the business are not on Basic.
Paid plans, from the catalog: Pro Site — $50 up to 3 open projects, hands-free talk and receipt scan, email and 1:1 WhatsApp, ₪5 of assistant help per day, 10GB storage. Pro Crew — $75 up to 10 open projects, export numbers for the office, ₪8 of assistant help per day, 15GB, everything in Pro Site. Pro Command — $125 unlimited open projects, WhatsApp groups, priority support, ₪12 of assistant help per day, 20GB, everything in Pro Crew.
One open maintenance contract on Basic is enough to learn the habit. Several sites at once need more open projects. Voice on a roof is Pro Site. WhatsApp groups for a bigger crew are Pro Command only. Do not tell a customer Helmate is a booking receptionist — it is not.
The visit log is also how you hand a clean history to a new owner or a landlord who asks whether March was actually done.
A year that you can show
Four visits, four logs, four next dates. When they ask 'have you been coming', you have dates and photos, not a vibe. When they sell the house, you can hand over a clean history. That is the product of a boring template, not of a clever app feature we do not have.
The boring template also trains the helper. Visit one they shadow. Visit two they write the filters and the drain while you do the electrical visual. Visit three they can leave a log you would sign. None of that happens if the 'log' is you telling the office 'all good' from the cab.
If a site has three units, write three short blocks, not one paragraph that says 'all units ok'. The no-cool in August will be on unit 2. A combined line will not tell you which coil you actually saw. If unit 2 is in a locked plant room, write that too, with who has the key, so the next visit is not a wasted drive. Access is part of the maintenance log, not a surprise you discover every time.
The same log is what you show when a new buyer asks for service history, or when a landlord asks whether the boiler was actually serviced in March. WhatsApp is not that history. A project with dated visits is. Helmate is an app for that file. It is not a receptionist that books the next call for you, and it is not a certificate issuer. It is the place the visit still exists after the van has left. Write the next date before you pack the tools, while the site is still in front of you, not from the ring road when the name of the street has already gone.
FAQ
How detailed should an HVAC maintenance log be?
Short: unit, work done, defects, declined repairs, next date, a few photos. Same day. A long write-up on Friday misses the capacitor they declined in the driveway.
Should maintenance visits live on the install project?
No. Keep a maintenance contract as its own project so twelve visits are not buried under a changeout. Link the two with a note if the unit was yours.
Does Helmate book the next visit for the customer?
No. Helmate is not a visit-booking or call-answering service. You put the next date on the project and you call or message the customer yourself, or you use a dispatch tool for that.
What if they refuse a repair during the visit?
Write it. Send the number. Do not fit the part 'to be nice' and fight about money later. The log is the proof you told them.
When do you pay for an HVAC app beyond Basic?
Basic: first month free, then $25/month for one open project with calendar and tasks. Choose Pro when you need more open jobs, or voice, receipt scan, email, and WhatsApp. Pro Site is $50 (3 projects), Pro Crew $75 (10), Pro Command $125 (unlimited open projects).